Design, Supply and Install Emergency Lights (E-Lights). We were required to design by way of complying with SCDF public evacuation considerations, lux simulation to comply with LTA and SCDF guidelines, and then install the required numbers of E-Lights, upgrade both onsite Distribution Boards and ensure compliance with EMA and LTA electrical safety and performance requirements such as Megger test and Structural Engineer’s approval for the installation process.